AA battery replacement project tutorial #10: Layers and USB-C Placement
Continue
This entire project is intended to be done within the free trial period.
[This is Part 10 of the tutorial, for Part 1 click HERE]
Moving Between Layers
Go to Display Control and ensure you’re on the Edit tab

Play around and click the white area next to each layer, that selects which layer you’re on

You can also uncheck the visibility of whole layers, or only certain bits of each layer

Check those options out as you continue this tutorial.

Feel free to save the scheme if it’s something you think you’ll work with often

Short-cut!
And before you ask, yes of course there is a shortcut! 😏 (see next section)
Product Support Co-Pilot
Don’t forget you can always ask the Product Support Co-Pilot for virtually anything. See its answer on shortcuts in the image below


Let’s Get Placing!
For Placement, you’d probably want to be in the placement mode as circled below. But select mode (orange one) can work too depending on your preference.

We will start by placing our UCB C component group on our TOP layer.
Place the USB-C components as circled in the image below (there’s a little reminder section on component placement underneath)
CAUTION: Your part numbers might be different to mine! Just place sensibly 🙂

REMINDER: Place Planning Groups – Sequentially
Right click on one of your planning groups → Place Planning Group

Move your mouse to your layout area and click

Right click your newly placed circle → Place Parts Sequentially

Click, then click, then click! Isn’t that cool?!
That’s it for today!
Close your project, and let’s continue next time. Let me know if you enjoyed this tutorial in the comments!
And if you are struggling with anything, post your issue in the comments and I’ll get back to you as soon as I can.
Have a wonderful Xpedition!