Boost Laboratory Efficiency with Optimized Scheduling

We’re excited to share our latest infographic, which illustrates how Siemens Opcenter™ Advanced Planning and Scheduling (APS) software can streamline laboratory scheduling, enabling lab managers and technicians to collaborate seamlessly and maximize efficiency. The specifically designed lab templates are part of APS from Version 2404 on.

From Tradition to Innovation: How Polipak is Leading the Way in Sustainable Plastic Film Production

Every household and industry relies on plastic films, refuse sacks, and tube sleeve foils, making these indispensable everyday products. Polipak…

Opcenter Scheduling SMT

What’s new in Opcenter Scheduling SMT 2410

Introducing the latest version 2410 of Opcenter™ Scheduling SMT software. Seamlessly connecting planners to the shop floor, this release offers a range of new features and capabilities. Experience an integrated view of actual production progress compared to the scheduled timeline. Get a detailed schedule with the new Gantt chart experience. Benefit from seamless integration with Opcenter Intra Plant Logistics for enhanced access control and secure communication.

Opcenter APS

What’s new in Opcenter APS 2410

Discover what’s new in Opcenter APS 2410, the latest release designed to streamline your production planning and scheduling processes. Our new features empower you to take sustainability, resilience, and flexibility to new levels.

Opcenter APS

What’s new in Opcenter APS 2404

Extending labor modeling to support changes across capacity periods We are excited to announce that the new version of Opcenter…

Opcenter Scheduling SMT

What’s new in Opcenter Scheduling SMT 2404

Enhancing the ability to visualize actual versus scheduled events Opcenter™ Scheduling SMT software is a tool for the surface-mount technology…

Discover the exciting new features of Opcenter APS 2310 in this video

Opcenter APS 2310 is now available. Learn about the new features and capabilities in this informative video.

Streamlining Processes and Boosting Efficiency: How Applied Composites Transformed Planning and Scheduling with Opcenter APS

In today’s rapidly evolving aerospace and defense industries, efficient planning and scheduling are crucial for success. Applied Composites, a global…

Opcenter APS

What’s new in Opcenter APS 2310

Increasing schedule flexibility with constraint modeling to support off-shift periods We are excited to announce that the new version of…