Featured posts

Latest posts

Unlock testing excellence: Your monthly Simcenter Physical testing update | April 2026

Discover the latest news from Simcenter Physical Testing that are transforming the way engineers approach testing. Check back regularly as we continuously update this blog with the freshest Simcenter Physical Testing news, tips, and insights.

What’s new in Simcenter Flotherm 2604?

Read about the latest enhancements in the Simcenter Flotherm 2604 electronics cooling simulation software release below, or click on a…

Simulation business case approved

Lost in translation: How one engineer learned to speak CFO – Epilogue

This is a fictional story, with fictional characters working for a fictional company, but it’s built on real experiences. From…

(AI-Accelerated CFD) Drawing Hands

From ‘delve’ to neural operators: How AI is reshaping our writing and our CFD

How AI linguistic patterns mirror the rise of AI-Accelerated CFD Tools that shape us We shape our tools and thereafter…

NEW RELEASE: Simcenter HEEDS Connect 2604

Simcenter HEEDS Connect 2604 is here, and it’s packed with powerful enhancements designed to help engineering teams collaborate seamlessly, explore possibilities together, and make more confident design decisions in real-time, online.

Simcenter HEEDS 2510

Simcenter HEEDS 2604: Modernized design optimization with AI surrogates, streamlined resource management and enhanced simulation integration

This blog outlines how the latest release from Simcenter HEEDS 2604 accelerates design optimization workflows for engineers working with high…

Simcenter fluids and thermal

Transforming engineering with AI and simulation technology

The hidden costs of sticking with the status quo: why product development needs a closed-loop and open architecture approach Faster…

BSH Simcenter Amesim case study: optimizing coffee machine development faster

Brewing better products: How simulation helps engineers optimize coffee machines faster

Product innovation is rarely simple anymore, even in everyday appliances. Behind a premium coffee experience sits a surprisingly complex mechatronic…

Simulation business case approved

Lost in translation: How one engineer learned to speak CFO – Chapter 4

This is a fictional story, with fictional characters working for a fictional company, but it’s built on real experiences. From…