{"id":530,"date":"2021-03-22T09:28:51","date_gmt":"2021-03-22T13:28:51","guid":{"rendered":"https:\/\/blogs.sw.siemens.com\/valor\/?p=530"},"modified":"2026-03-26T13:30:51","modified_gmt":"2026-03-26T17:30:51","slug":"siemens-bom-connector-edacafe-broadcast-oren-manor","status":"publish","type":"post","link":"https:\/\/blogs.sw.siemens.com\/valor\/2021\/03\/22\/siemens-bom-connector-edacafe-broadcast-oren-manor\/","title":{"rendered":"Siemens BOM Connector: EDACafe Bunker Broadcast with Oren Manor"},"content":{"rendered":"\n<p>New product introductions and customization have been increasing rapidly over the past few years \u2013 with the results that the already-small profit margins in electronics assembly are shrinking even further.<\/p>\n\n\n\n<p>That makes accurate quoting more critical than ever, but, as any electronics manufacturer knows, that\u2019s no easy task. Customer bill-of-materials (BOM) file types, formats (text, XML, database) and headings vary greatly, and OEMs are forced to invest significant resources in cleaning the data and mapping out the fields before creating a quote. Even after they are mapped, there is no way to validate the components, no assurance that a mapped component is actually available for purchase and no way to check if there is an accessible variant option that is less expensive. These challenges lead to inaccurate quotes and problems during sourcing and production.<\/p>\n\n\n\n<p>And that\u2019s exactly why Siemens developed the recently-released <a href=\"https:\/\/www.plm.automation.siemens.com\/global\/en\/products\/manufacturing-planning\/bom-connector.html\" target=\"_blank\" rel=\"noreferrer noopener\">Valor\u2122 BOM Connector<\/a>. Oren Manor, Director of Electronics Manufacturing at Valor, sat down with Sanjay Gangal of the EDACafe Bunker Broadcast to discuss how BOM Connector addresses critical quoting challenges.<\/p>\n\n\n\n<p><a href=\"http:\/\/bit.ly\/EDACafeBOMConnector\" target=\"_blank\" rel=\"noreferrer noopener\">Watch the EDACafe Bunker Broadcast with Oren Manor&gt;&gt;<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"568\" src=\"https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/22\/2021\/03\/Oren-EDACafe-broadcast-1024x568.png\" alt=\"Oren Manor broadcast BOM Connector\" class=\"wp-image-534\" srcset=\"https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/22\/2021\/03\/Oren-EDACafe-broadcast-1024x568.png 1024w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/22\/2021\/03\/Oren-EDACafe-broadcast-300x166.png 300w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/22\/2021\/03\/Oren-EDACafe-broadcast-768x426.png 768w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/22\/2021\/03\/Oren-EDACafe-broadcast-1536x852.png 1536w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/22\/2021\/03\/Oren-EDACafe-broadcast-2048x1136.png 2048w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/22\/2021\/03\/Oren-EDACafe-broadcast-900x499.png 900w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Accelerating PCB quoting <\/h2>\n\n\n\n<p>He explained that BOM Connector software was created to <a href=\"https:\/\/blogs.sw.siemens.com\/valor\/2020\/11\/11\/how-to-minimize-quoting-time-and-increase-accuracy-in-an-ems-environment\/\" target=\"_blank\" rel=\"noreferrer noopener\">reduce the time needed to generate accurate quotations<\/a> for printed circuit board (PCB) assemblies. BOM Connector imports and creates templates from BOM files and connects them directly to the manufacturer\u2019s ERP system. When integrated with Valor Process Preparation, it can even provide a translated CAD file that can be used to ensure that all parts are appropriate for the board. <\/p>\n\n\n\n<p>\u201cIt\u2019s all about accuracy,\u201d said Manor. \u201cThe profit margins are small in small-lot, high-mix production, so they have to be accurate. Since there are so many quotes, they have to be fast too.\u201d He added, \u201cFifteen years ago, the PCB was the product. Today, most products are a system, with multiple PCBs, cables and enclosures. Many manufacturers want to provide turnkey products that have multiple BOMs, making it even more complicated.\u201d<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">COVID-19 impact on component sourcing<\/h2>\n\n\n\n<p>Gangal was curious how the global pandemic has impacted the process. Manor said that during the pandemic, it wasn\u2019t always possible to source products internationally. OEMs had to look for alternatives that weren\u2019t always a one-to-one fit, requiring revisions. It became a global challenge, but one that BOM Connector could help solve.<\/p>\n\n\n\n<p>Covid-19 also accelerated existing trends, like moving production between sites dues to lockdown. Manor noticed that OEMs were forced to be more diversified and flexible and identify local partners. \u201cYou have to ask all of these questions to make the decisions fast and find the optimal BOM\u2026 With BOM Connector, this is possible,\u201d he said.<\/p>\n\n\n\n<p>\u201cWe offer a holistic solution for process engineering, merging the CAD and the BOM, placement programs, inspection and test programs, stencil design, design validation, work construction etc. BOM Connector is the last stage, giving you everything you need to get the PCB into production as quickly as possible with the highest quality, a single data source and fewer errors, and first-time-right production,\u201d Manor concluded.<\/p>\n\n\n\n<p>See the full interview <a href=\"http:\/\/bit.ly\/EDACafeBOMConnector\" target=\"_blank\" rel=\"noreferrer noopener\">here<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>New product introductions and customization have been increasing rapidly over the past few years \u2013 with the results that the&#8230;<\/p>\n","protected":false},"author":69244,"featured_media":531,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"spanish_translation":"","french_translation":"","german_translation":"","italian_translation":"","polish_translation":"","japanese_translation":"","chinese_translation":"","footnotes":""},"categories":[1],"tags":[57,58,49],"industry":[],"product":[],"coauthors":[],"class_list":["post-530","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-electronics-manufacturing","tag-pcb-assembly","tag-process-preparation-for-electronics-manufacturing"],"featured_image_url":"https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/22\/2021\/03\/BOM_connector5.jpg","_links":{"self":[{"href":"https:\/\/blogs.sw.siemens.com\/valor\/wp-json\/wp\/v2\/posts\/530","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.sw.siemens.com\/valor\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.sw.siemens.com\/valor\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/valor\/wp-json\/wp\/v2\/users\/69244"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/valor\/wp-json\/wp\/v2\/comments?post=530"}],"version-history":[{"count":3,"href":"https:\/\/blogs.sw.siemens.com\/valor\/wp-json\/wp\/v2\/posts\/530\/revisions"}],"predecessor-version":[{"id":536,"href":"https:\/\/blogs.sw.siemens.com\/valor\/wp-json\/wp\/v2\/posts\/530\/revisions\/536"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/valor\/wp-json\/wp\/v2\/media\/531"}],"wp:attachment":[{"href":"https:\/\/blogs.sw.siemens.com\/valor\/wp-json\/wp\/v2\/media?parent=530"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/valor\/wp-json\/wp\/v2\/categories?post=530"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/valor\/wp-json\/wp\/v2\/tags?post=530"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/valor\/wp-json\/wp\/v2\/industry?post=530"},{"taxonomy":"product","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/valor\/wp-json\/wp\/v2\/product?post=530"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/valor\/wp-json\/wp\/v2\/coauthors?post=530"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}