{"id":6753,"date":"2022-07-26T09:40:20","date_gmt":"2022-07-26T13:40:20","guid":{"rendered":"https:\/\/blogs.sw.siemens.com\/tecnomatix\/?p=6753"},"modified":"2026-03-26T07:06:38","modified_gmt":"2026-03-26T11:06:38","slug":"logistic-planning-in-universities-material-flow-simulation-for-students","status":"publish","type":"post","link":"https:\/\/blogs.sw.siemens.com\/tecnomatix\/logistic-planning-in-universities-material-flow-simulation-for-students\/","title":{"rendered":"Logistics Planning in Universities? Material Flow Simulation for Students?"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">The Plant Simulation Student Challenge starts into round two: Solve our electric motor final assembly task! <strong>Join the Tecnomatix Plant Simulation Award with the Chance to Win a Microsoft Surface Touchscreen-Based Computer, a Powerful Bluetooth Wireless Speaker, or a Smart Watch<\/strong>!<\/h2>\n\n\n\n<p>The Plant Simulation Student Challenge starts into round two: Solve the electric motor final assembly task!<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-medium\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"370\" src=\"https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/7\/2022\/07\/plant_sim_challenge-600x370.png\" alt=\"Plant Simulation Student Award Invitation\" class=\"wp-image-6756\" srcset=\"https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/7\/2022\/07\/plant_sim_challenge-600x370.png 600w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/7\/2022\/07\/plant_sim_challenge-1024x631.png 1024w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/7\/2022\/07\/plant_sim_challenge-768x474.png 768w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/7\/2022\/07\/plant_sim_challenge-1536x947.png 1536w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/7\/2022\/07\/plant_sim_challenge-900x555.png 900w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/7\/2022\/07\/plant_sim_challenge.png 1727w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption>Plant Simulation Student Price Invitation<\/figcaption><\/figure><\/div>\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link\" href=\"https:\/\/ecosystem.siemens.com\/softwareforinnovators\/plant-simulation-challenge-task-2\/overview\" target=\"_blank\" rel=\"noopener\">Join the Challenge<\/a><\/div>\n<\/div>\n\n\n\n<p><a href=\"https:\/\/ecosystem.siemens.com\/softwareforinnovators\/plant-simulation\/overview\" target=\"_blank\" rel=\"noreferrer noopener\">Plant Simulation Challenge<\/a><\/p>\n\n\n\n<p>Siemens Digital Industries Software <a href=\"https:\/\/www.linkedin.com\/groups\/9163979\/\" target=\"_blank\" rel=\"noreferrer noopener\">Tecnomatix Plant Simulation<\/a> is the software for modeling, simulating, analyzing, visualizing, and optimizing of production systems, logistics and processes. You can create a Digital Twin of a process, a production line or even a full factory and develop, enhance, or adjust it to new requirements.<\/p>\n\n\n\n<p><a href=\"https:\/\/ecosystem.siemens.com\/softwareforinnovators\/plant-simulation\/overview\" target=\"_blank\" rel=\"noopener\"><strong>Register for the quarterly challenges now! <\/strong><\/a><\/p>\n\n\n\n<p><a href=\"https:\/\/www.plm.automation.siemens.com\/plmapp\/education\/plant-simulation\/en_us\/free-software\/student\" target=\"_blank\" rel=\"noreferrer noopener\">Register and solve our given tasks by using Tecnomatix Plant Simulation. Download your free Student Version right<\/a> <a href=\"https:\/\/www.plm.automation.siemens.com\/global\/en\/our-story\/partners\/academic\/student-software.html\" target=\"_blank\" rel=\"noopener\">here<\/a>!<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Awards:<\/h3>\n\n\n\n<p>First place wins a <strong>Microsoft Surface<\/strong> touchscreen-based computer!<\/p>\n\n\n\n<p>Second place wins a powerful <strong>Bluetooth Wireless Speaker<\/strong>, and third place wins a <strong>Smart Watch<\/strong>.<\/p>\n\n\n\n<p>All participants with reasonable solutions will receive a <strong>digital badge<\/strong> acknowledging you as a Plant Simulation challenge participant.<\/p>\n\n\n\n<p><a href=\"https:\/\/ecosystem.siemens.com\/softwareforinnovators\/plant-simulation\/overview\" target=\"_blank\" rel=\"noopener\">Register for the quarterly challenges now! <\/a><\/p>\n\n\n\n<p>The solution must be solved with Tecnomatix Plant Simulation.<br>Anyone outside Siemens Digital Industries Software and its business partners may participate.<br>Important dates:<br>    Announcement of the task: July 11<sup>th<\/sup>, 2022<br>    Deadline for submissions: September 30<sup>th<\/sup>, 2022<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-medium\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"400\" src=\"https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/7\/2022\/07\/asset-4d2466bd-0b69-45a1-892d-bebe4f61984e-original-600x400.jpeg\" alt=\"Discrete Event Simulation in Universities, Accademics, Teaching and Learning\" class=\"wp-image-6764\" srcset=\"https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/7\/2022\/07\/asset-4d2466bd-0b69-45a1-892d-bebe4f61984e-original-600x400.jpeg 600w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/7\/2022\/07\/asset-4d2466bd-0b69-45a1-892d-bebe4f61984e-original-1024x683.jpeg 1024w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/7\/2022\/07\/asset-4d2466bd-0b69-45a1-892d-bebe4f61984e-original-768x512.jpeg 768w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/7\/2022\/07\/asset-4d2466bd-0b69-45a1-892d-bebe4f61984e-original-1536x1024.jpeg 1536w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/7\/2022\/07\/asset-4d2466bd-0b69-45a1-892d-bebe4f61984e-original-2048x1366.jpeg 2048w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/7\/2022\/07\/asset-4d2466bd-0b69-45a1-892d-bebe4f61984e-original-900x600.jpeg 900w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/figure><\/div>\n\n\n<h3 class=\"wp-block-heading\"><a href=\"https:\/\/ecosystem.siemens.com\/softwareforinnovators\/plant-simulation-challenge-task-2\/overview\" target=\"_blank\" rel=\"noreferrer noopener\">Electric motor final assembly<\/a><\/h3>\n\n\n\n<figure class=\"wp-block-image size-medium\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"291\" src=\"https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/7\/2022\/07\/Student_Price_Task_2a-600x291.png\" alt=\"\" class=\"wp-image-6757\" srcset=\"https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/7\/2022\/07\/Student_Price_Task_2a-600x291.png 600w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/7\/2022\/07\/Student_Price_Task_2a-1024x497.png 1024w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/7\/2022\/07\/Student_Price_Task_2a-768x373.png 768w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/7\/2022\/07\/Student_Price_Task_2a-900x437.png 900w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/7\/2022\/07\/Student_Price_Task_2a.png 1319w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><figcaption>Plant Simulation Student Award<\/figcaption><\/figure>\n\n\n\n<p><em>A major car manufacturer wants to build a new production line for electric motors. <\/em><\/p>\n\n\n\n<p><em>In the final assembly area, three machines and a quality inspection station are connected by conveyor belts.<\/em><\/p>\n\n\n\n<p><em>All conveyor belts have a transportation speed of 1 m\/s.<\/em><\/p>\n\n\n\n<p><em>For the first machine (M1), the processing time is 15 seconds.<\/em><\/p>\n\n\n\n<p><em>For the second machine (M2), the processing time is 10 seconds, and this machine may malfunction. The machine <em>M2<\/em><\/em> <em>has an availability of 88% and a Mean Time to Repair (MTTR) of one minute.<\/em><\/p>\n\n\n\n<p><em>After the machine <em>M2<\/em>, the material flow is split up, as follows:<\/em><\/p>\n\n\n\n<p><em>90% of the motors go directly to the third machine (M3) and 10% of the motors are moved to the quality inspection station (Q1).<\/em><\/p>\n\n\n\n<p><em>Since the quality inspection time is not yet exactly <em>known<\/em> and is subject to a manual process. We assume that the time will be equally distributed between one minute and four minutes.<\/em><\/p>\n\n\n\n<p><em>After quality inspection <em>the parts<\/em><\/em> <em>are sent to the machine M3.<\/em><\/p>\n\n\n\n<p><em>The processing time of machine 3 (M3) is 10 seconds.<\/em><\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Questions:<\/h4>\n\n\n\n<p><em>Q1: Compute the average throughput per day of the line.<\/em><\/p>\n\n\n\n<p><em>Q2: Find out the relative occupancy of the quality inspection station.<\/em><\/p>\n\n\n\n<p><em>Q3: Which station is most relevant for the output quantity of the plant?<\/em><\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link\" href=\"https:\/\/ecosystem.siemens.com\/media\/download\/f6a93780d4ad851a66d0326d6d99b3ce\" target=\"_blank\" rel=\"noreferrer noopener\">Download the task as PDF here.<\/a><\/div>\n<\/div>\n\n\n\n<h3 class=\"wp-block-heading\">German: Produktionslinie f\u00fcr Elektromotoren<\/h3>\n\n\n\n<p>Ein gro\u00dfer Automobilhersteller m\u00f6chte eine neue Produktionslinie f\u00fcr Elektromotoren aufbauen.<\/p>\n\n\n\n<p>Im Bereich der Endmontage kommen dazu 3 Maschinen, die \u00fcber F\u00f6rderb\u00e4nder verbunden sind und eine Qualit\u00e4tssicherung zum Einsatz.<\/p>\n\n\n\n<p>Alle F\u00f6rderb\u00e4nder haben eine Transportgeschwindigkeit von 1m\/s.<\/p>\n\n\n\n<p>In der ersten Maschine M1 betr\u00e4gt die Bearbeitungszeit 15 Sekunden.<\/p>\n\n\n\n<p>In der zweiten Maschine M2 betr\u00e4gt die Bearbeitungszeit 10 Sekunden, in dieser Maschine kann es zu St\u00f6rungen kommen. Die Maschine M2 hat eine Verf\u00fcgbarkeit von 88% und eine Mean Time to Repair (MTTR) von einer Minute.<\/p>\n\n\n\n<p>Nach der Maschine M2 teilt sich der Materialfluss auf:<\/p>\n\n\n\n<p>90% der Motoren gehen direkt weiter an die Maschine M3, 10% der Motoren werden zur Qualit\u00e4tssicherung Q1 ausgeschleust.<\/p>\n\n\n\n<p>Da die Qualit\u00e4tssicherung noch nicht genau bekannt ist und einem manuellen Prozess unterliegt soll die Zeit f\u00fcr Qualit\u00e4tssicherung gleichverteilt zwischen einer Minute und vier Minuten angenommen werden.<\/p>\n\n\n\n<p>Auch die Teile nach der Qualit\u00e4tssicherung werden zu Maschine M3 geschickt.<\/p>\n\n\n\n<p>Die Bearbeitungszeit in der Maschine M3 betr\u00e4gt 10 Sekunden.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Fragen:<\/h4>\n\n\n\n<p>F1: Berechnen Sie die mittlere Ausbringungsmenge der Anlage pro 24 Stunden.<\/p>\n\n\n\n<p>F2: Berechnen sie die relative Belegung in der Qualit\u00e4tssicherung.<\/p>\n\n\n\n<p>F3: Welche Station ist entscheidend f\u00fcr die Ausbringungsmenge der Anlage?<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Chinese<\/strong><\/h3>\n\n\n\n<p><strong><em>\u7535\u673a<\/em><\/strong><strong><em>\u88c5\u914d<\/em><\/strong><\/p>\n\n\n\n<p><em>\u4e00\u5bb6\u5927\u578b\u6c7d<\/em><em>\u8f66\u5236\u9020\u5546\u5e0c\u671b\u5efa\u9020\u4e00\u6761\u65b0\u7684\u7535\u673a\u751f\u4ea7\u7ebf\u3002<\/em><\/p>\n\n\n\n<p><em>\u5728<\/em><em>\u603b\u88c5\u533a\uff0c<\/em><em>3<\/em><em>\u53f0\u673a\u5668\u548c\u4e00\u4e2a<\/em><em>\u8d28\u91cf\u68c0\u6d4b\u7ad9\u901a\u8fc7\u4f20\u9001\u5e26\u8fde\u63a5\u3002<\/em><\/p>\n\n\n\n<p><em>\u6240\u6709<\/em><em>\u8f93\u9001\u5e26\u7684\u8fd0\u8f93\u901f\u5ea6\u5747\u4e3a<\/em><em> 1 m\/s<\/em><em>\u3002<\/em><\/p>\n\n\n\n<p><em>\u5bf9\u4e8e\u7b2c\u4e00\u53f0\u673a\u5668\uff08<\/em><em>M1<\/em><em>\uff09\uff0c<\/em><em>\u5de5<\/em><em>\u827a<\/em><em>\u65f6\u95f4\u4e3a<\/em><em>15<\/em><em>\u79d2\u3002<\/em><\/p>\n\n\n\n<p><em>\u5bf9\u4e8e\u7b2c\u4e8c\u53f0\u673a\u5668\uff08<\/em><em>M2<\/em><em>\uff09\uff0c<\/em><em>\u5de5<\/em><em>\u827a<\/em><em>\u65f6\u95f4\u4e3a<\/em><em>10<\/em><em>\u79d2\uff0c<\/em><em>\u8fd9\u53f0\u673a\u5668\u53ef\u80fd\u4f1a\u51fa\u73b0\u6545\u969c\u3002<\/em><em>M2 <\/em><em>\u673a\u5668\u7684<\/em><em>\u5229\u7528\u7387<\/em><em>\u4e3a<\/em><em> 88%<\/em><em>\uff0c\u5e73\u5747<\/em><em>\u7ef4\u4fee\u65f6\u95f4<\/em><em> <\/em><em>\uff08<\/em><em>MTTR<\/em><em>\uff09<\/em><em> <\/em><em>\u4e3a<\/em><em> 1 <\/em><em>\u5206<\/em><em>\u949f\u3002<\/em><\/p>\n\n\n\n<p><em>\u5728<\/em><em>M2<\/em><em>\u673a\u5668\u4e4b\u540e\uff0c\u7269\u6599\u6d41\u88ab<\/em><em>\u5206\u6d41<\/em><em>\u5982\u4e0b\uff1a<\/em><\/p>\n\n\n\n<p><em>90%<\/em><em>\u7684<\/em><em>\u7535\u673a\u76f4\u63a5\u8fdb\u5165\u7b2c\u4e09\u53f0\u673a\u5668\uff08<\/em><em>M3<\/em><em>\uff09\uff0c<\/em><em>10%<\/em><em>\u7684<\/em><em>\u7535\u673a\u79fb\u81f3\u8d28\u91cf\u68c0\u6d4b\u7ad9\uff08<\/em><em>Q1<\/em><em>\uff09\u3002<\/em><\/p>\n\n\n\n<p><em>\u7531\u4e8e<\/em><em>\u8d28\u91cf\u68c0\u67e5\u65f6\u95f4\u5c1a\u4e0d\u786e\u5207\uff0c\u5e76\u4e14\u9700\u8981\u624b\u52a8\u5904\u7406\uff0c\u56e0\u6b64\u5e94\u5047\u5b9a\u65f6\u95f4\u5c06\u5e73\u5747\u5206\u5e03\u5728\u4e00\u5206\u949f\u5230\u56db\u5206\u949f\u4e4b\u95f4\u3002<\/em><\/p>\n\n\n\n<p><em>\u8d28\u91cf\u68c0\u67e5\u540e\u7684\u96f6\u4ef6\u88ab\u9001\u5230<\/em><em>M3<\/em><em>\u673a\u5668\u3002<\/em><\/p>\n\n\n\n<p><em>\u673a\u5668<\/em><em>3<\/em><em>\uff08<\/em><em>M3<\/em><em>\uff09\u4e2d\u7684<\/em><em>\u5de5<\/em><em>\u827a\u5904<\/em><em>\u7406<\/em><em>\u65f6\u95f4\u4e3a<\/em><em>10<\/em><em>\u79d2\u3002<\/em><\/p>\n\n\n\n<p><em>\u95ee\u9898\uff1a<\/em><\/p>\n\n\n\n<p><em>Q1<\/em><em>\uff1a<\/em><em>\u8ba1\u7b97\u751f\u4ea7\u7ebf\u6bcf\u5929\u7684\u5e73\u5747<\/em><em>\u4ea7<\/em><em>\u91cf\u3002<\/em><\/p>\n\n\n\n<p><em>Q2<\/em><em>\uff1a<\/em><em>\u8ba1\u7b97\u8d28\u68c0\u7ad9\u7684\u76f8\u5bf9\u5360\u7528\u7387\u3002<\/em><\/p>\n\n\n\n<p><em>Q3\uff1a\u54ea\u4e2a\u7ad9\u4e0e\u5de5\u5382\u7684\u4ea7\u91cf\u6700\u76f8\u5173\uff1f<\/em><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>France: Assemblage final du moteur \u00e9lectrique<\/strong><\/h3>\n\n\n\n<p>Un grand constructeur automobile veut construire une nouvelle ligne de production de moteurs \u00e9lectriques.<\/p>\n\n\n\n<p>Dans la zone d\u2019assemblage final, 3 machines et un poste de contr\u00f4le qualit\u00e9 sont reli\u00e9s par des bandes transporteuses.<\/p>\n\n\n\n<p>Toutes les bandes transporteuses ont une vitesse de transport de 1 m\/s.<\/p>\n\n\n\n<p>Pour la premi\u00e8re machine (M1), le temps de traitement est de 15 secondes.<\/p>\n\n\n\n<p>Pour la deuxi\u00e8me machine (M2), le temps de traitement est de 10 secondes et cette machine peut mal fonctionner. La machine M2 a une disponibilit\u00e9 de 88% et un temps moyen de r\u00e9paration (MTTR) d\u2019une minute.<\/p>\n\n\n\n<p>Apr\u00e8s la machine M2, le flux de mati\u00e8re est divis\u00e9 comme suit :<\/p>\n\n\n\n<p>90% des moteurs vont directement \u00e0 la troisi\u00e8me machine (M3) et 10% des moteurs sont d\u00e9plac\u00e9s vers la station de contr\u00f4le qualit\u00e9 (Q1).<\/p>\n\n\n\n<p>\u00c9tant donn\u00e9 que le temps d\u2019inspection de la qualit\u00e9 n\u2019est pas encore connu exactement et fait l\u2019objet d\u2019un processus manuel, il convient de supposer que le temps sera r\u00e9parti \u00e9galement entre une minute et quatre minutes.<\/p>\n\n\n\n<p>Les pi\u00e8ces apr\u00e8s contr\u00f4le de qualit\u00e9 sont envoy\u00e9es \u00e0 la machine M3.<\/p>\n\n\n\n<p>Le temps de traitement dans la machine 3 (M3) est de 10 secondes.<\/p>\n\n\n\n<p>Questionne :<\/p>\n\n\n\n<p>Q1: Calculez le d\u00e9bit moyen par jour de la ligne.<\/p>\n\n\n\n<p>Q2: Calculer l\u2019occupation relative dans le poste d\u2019inspection de la qualit\u00e9.<\/p>\n\n\n\n<p>Q3: Quelle station est la plus pertinente pour la quantit\u00e9 de sortie de l\u2019usine?<\/p>\n\n\n\n<p>\ub450 \ubc88\uc9f8 \ub77c\uc6b4\ub4dc\uc5d0 \ucc38\uac00\ud560 \uc900\ube44\uac00 \ub418\uc168\ub098\uc694?<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Plant Simulation<\/strong>\ud559\uc0dd \ucc4c\ub9b0\uc9c0\ub294\ub450 \ub77c\uc6b4\ub4dc\ub85c <strong>Task<\/strong>\ub97c \ub9cc\ub4ed\ub2c8\ub2e4 : \uc804\uae30 \ubaa8\ud130 \ucd5c\uc885 \uc870\ub9bd \uc791\uc5c5\uc744 \ud574\uacb0\ud558\uc2ed\uc2dc\uc624!<\/h3>\n\n\n\n<p><a href=\"https:\/\/ecosystem.siemens.com\/softwareforinnovators\/plant-simulation\/overview\" target=\"_blank\" rel=\"noopener\"><strong>\uc9c0\uae08\ubd84\uae30\ubcc4\ucc4c\ub9b0\uc9c0\uc5d0\ub4f1\ub85d\ud558\uc138\uc694! <\/strong><\/a><\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Plant Simulation\ucc4c\ub9b0\uc9c0 &#8211; \uc791\uc5c5 2<\/strong><\/h4>\n\n\n\n<p>Tecnomatix Plant Simulation\uc740 \uc0dd\uc0b0 \uc2dc\uc2a4\ud15c, \ubb3c\ub958 \ubc0f \ud504\ub85c\uc138\uc2a4\uc758 \ubaa8\ub378\ub9c1, \uc2dc\ubbac\ub808\uc774\uc158, \ubd84\uc11d, \uc2dc\uac01\ud654 \ubc0f \ucd5c\uc801\ud654\ub97c \uc704\ud55c \uc18c\ud504\ud2b8\uc6e8\uc5b4\uc785\ub2c8\ub2e4. \uacf5\uc815, \uc0dd\uc0b0 \ub77c\uc778 \ub610\ub294 \uc804\uccb4 \uacf5\uc7a5\uc758 \ub514\uc9c0\ud138 \ud2b8\uc708\uc744 \ub9cc\ub4e4\uace0 \uc0c8\ub85c\uc6b4 \uc694\uad6c \uc0ac\ud56d\uc5d0 \ub9de\uac8c \uac1c\ubc1c, \ud5a5\uc0c1 \ub610\ub294 \uc870\uc815\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\ub3c4\uc804\uc758 \uaddc\uce59<\/p>\n\n\n\n<p>Tecnomatix Plant Simulation\uc744 \uc0ac\uc6a9\ud558\uc5ec \uc8fc\uc5b4\uc9c4 \uc791\uc5c5\uc744 \ub4f1\ub85d\ud558\uace0 \ud574\uacb0\ud558\uc2ed\uc2dc\uc624. \uc5ec\uae30\uc5d0\uc11c \ubb34\ub8cc \ud559\uc0dd\ud310\uc744 \ub2e4\uc6b4\ub85c\ub4dc <a href=\"https:\/\/www.plm.automation.siemens.com\/global\/en\/our-story\/partners\/academic\/student-software.html\" target=\"_blank\" rel=\"noopener\">\ud558\uc2ed\uc2dc\uc624<\/a>!<\/p>\n\n\n\n<p>\uc218\uc0c1:<\/p>\n\n\n\n<p>\uccab \ubc88\uc9f8 \uc218\uc0c1\uc790\ub294 Microsoft Surface \ud130\uce58 \uc2a4\ud06c\ub9b0 \uae30\ubc18 \ucef4\ud4e8\ud130\ub97c \ubc1b\uac8c\ub429\ub2c8\ub2e4! \ub450 \ubc88\uc9f8 \uc218\uc0c1\uc790\ub294, \uac15\ub825\ud55c \ube14\ub8e8\ud22c\uc2a4 \ubb34\uc120 \uc2a4\ud53c\ucee4\uc640 \uc138 \ubc88\uc9f8 \uc218\uc0c1\uc790\ub294, \uc2a4\ub9c8\ud2b8 \uc2dc\uacc4.<\/p>\n\n\n\n<p>\ud569\ub9ac\uc801\uc778 \uc194\ub8e8\uc158\uc744 \uac16\ucd98 \ubaa8\ub4e0 \ucc38\uac00\uc790\ub294 \uadc0\ud558\ub97c Plant Simulation\ucc4c\ub9b0\uc9c0 \ucc38\uac00\uc790\ub85c \uc778\uc815\ud558\ub294 \ub514\uc9c0\ud138 \ubc30\uc9c0\ub97c \ubc1b\uac8c\ub429\ub2c8\ub2e4.<\/p>\n\n\n\n<p><a href=\"https:\/\/ecosystem.siemens.com\/softwareforinnovators\/plant-simulation\/overview\" target=\"_blank\" rel=\"noopener\">\uc9c0\uae08 \ubd84\uae30\ubcc4 \ucc4c\ub9b0\uc9c0\uc5d0 \ub4f1\ub85d\ud558\uc138\uc694! \u2192<\/a><\/p>\n\n\n\n<p>\uc774 \uc194\ub8e8\uc158\uc740 Tecnomatix Plant Simulation\uc744 \uc0ac\uc6a9\ud558\uc5ec \ud574\uacb0\ud574\uc57c \ud569\ub2c8\ub2e4.<br>Siemens Digital Industries Software \ubc0f \ube44\uc988\ub2c8\uc2a4 \ud30c\ud2b8\ub108 \uc678\ubd80\uc758 \ub204\uad6c\ub098 \ucc38\uc5ec\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<br>\uc911\uc694 \ub0a0\uc9dc<br>\uacfc\uc81c \ubc1c\ud45c : 2022 \ub144 7 \uc6d4 11 \uc77c<\/p>\n\n\n\n<p>\uc81c\ucd9c \ub9c8\uac10\uc77c : 2022 \ub144 9 \uc6d4 30 \uc77c<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">\u00bfListo para la segunda ronda?<\/h3>\n\n\n\n<p>Plant Simulation Student Challenge empieza la segunda ronda: \u00a1Resuelve nuestro ejercicio de ensamblaje final de motor el\u00e9ctrico!<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><a href=\"https:\/\/ecosystem.siemens.com\/softwareforinnovators\/plant-simulation\/overview\" target=\"_blank\" rel=\"noopener\"><strong>\u00a1Reg\u00edstrese para los desaf\u00edos trimestrales ahora! <\/strong><\/a><\/h4>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Plant Simulation Student Challenge &#8211; Tarea 2<\/strong><\/h3>\n\n\n\n<p>Tecnomatix Plant Simulation es el software para modelar, simular, analizar, visualizar y optimizar sistemas de producci\u00f3n, log\u00edstica y procesos. Puede crear un gemelo digital de un proceso, una l\u00ednea de producci\u00f3n o incluso una f\u00e1brica completa y desarrollarlo, mejorarlo o ajustarlo a los nuevos requisitos.<\/p>\n\n\n\n<p>Reglas del Desaf\u00edo<\/p>\n\n\n\n<p>Registrese y resuelva nuestras tareas dadas utilizando Tecnomatix Plant Simulation. \u00a1Descargue su copia gratuita para estudiantes <a href=\"https:\/\/www.plm.automation.siemens.com\/global\/en\/our-story\/partners\/academic\/student-software.html\" target=\"_blank\" rel=\"noopener\">aqu\u00ed<\/a>!<\/p>\n\n\n\n<p>Premios:<\/p>\n\n\n\n<p>\u00a1El ganador recibir\u00e1 una computadora basada en pantalla t\u00e1ctil Microsoft Surface! El participante que finalice en segundo lugar, un potente altavoz inal\u00e1mbrico Bluetooth y en tercer lugar, un reloj inteligente.<\/p>\n\n\n\n<p>Todos los participantes con soluciones razonables recibir\u00e1n una insignia digital que lo reconocer\u00e1 como participante del Desaf\u00edo de Simulaci\u00f3n de Plantas.<\/p>\n\n\n\n<p><a href=\"https:\/\/ecosystem.siemens.com\/softwareforinnovators\/plant-simulation\/overview\" target=\"_blank\" rel=\"noopener\">\u00a1Reg\u00edstrese para los desaf\u00edos trimestrales ahora! \u2192<\/a><\/p>\n\n\n\n<p>La soluci\u00f3n debe resolverse utilizando Tecnomatix Plant Simulation.<br>Cualquier persona ajena a Siemens Digital Industries Software y sus socios comerciales puede participar.<br>Fechas importantes<br>Anuncio de la tarea: 11 de julio de 2022<br>Fecha l\u00edmite de presentaci\u00f3n: 30 de septiembre2022<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Japanese<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">\u30e9\u30a6\u30f3\u30c92\u306e\u6e96\u5099\u306f\u3067\u304d\u307e\u3057\u305f\u304b?<\/h3>\n\n\n\n<p>\u30d7\u30e9\u30f3\u30c8\u30b7\u30df\u30e5\u30ec\u30fc\u30b7\u30e7\u30f3\u5b66\u751f\u30c1\u30e3\u30ec\u30f3\u30b8\u306e\u30bf\u30eb\u30c8\u3092\u30e9\u30a6\u30f3\u30c92\u306b:\u79c1\u305f\u3061\u306e \u96fb\u6c17\u30e2\u30fc\u30bf\u30fc\u306e\u6700\u7d42\u7d44\u307f\u7acb\u3066 \u30bf\u30b9\u30af\u3092\u89e3\u6c7a\u3057\u307e\u3059!<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><a href=\"https:\/\/ecosystem.siemens.com\/softwareforinnovators\/plant-simulation\/overview\" target=\"_blank\" rel=\"noopener\"><strong>\u56db\u534a\u671f\u3054\u3068\u306e\u30c1\u30e3\u30ec\u30f3\u30b8\u306b\u4eca\u3059\u3050\u767b\u9332\u3057\u307e\u3057\u3087\u3046!<\/strong><\/a><\/h4>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>\u30d7\u30e9\u30f3\u30c8\u30b7\u30df\u30e5\u30ec\u30fc\u30b7\u30e7\u30f3\u306e\u8ab2\u984c &#8211; \u30bf\u30b9\u30af2<\/strong><\/h4>\n\n\n\n<p>Tecnomatix\u30d7\u30e9\u30f3\u30c8\u30b7\u30df\u30e5\u30ec\u30fc\u30b7\u30e7\u30f3\u306f\u3001\u751f\u7523\u30b7\u30b9\u30c6\u30e0\u3001\u7269\u6d41\u3001\u30d7\u30ed\u30bb\u30b9\u306e\u30e2\u30c7\u30ea\u30f3\u30b0\u3001\u30b7\u30df\u30e5\u30ec\u30fc\u30b7\u30e7\u30f3\u3001\u5206\u6790\u3001\u8996\u899a\u5316\u3001\u6700\u9069\u5316\u306e\u305f\u3081\u306e\u30bd\u30d5\u30c8\u30a6\u30a7\u30a2\u3067\u3059\u3002\u30d7\u30ed\u30bb\u30b9\u3001\u751f\u7523\u30e9\u30a4\u30f3\u3001\u3055\u3089\u306b\u306f\u5de5\u5834\u5168\u4f53\u306e\u30c7\u30b8\u30bf\u30eb\u30c4\u30a4\u30f3\u3092\u4f5c\u6210\u3057\u3001\u65b0\u3057\u3044\u8981\u4ef6\u306b\u5408\u308f\u305b\u3066\u958b\u767a\u3001\u5f37\u5316\u3001\u307e\u305f\u306f\u8abf\u6574\u3059\u308b\u3053\u3068\u304c\u3067\u304d\u307e\u3059\u3002<\/p>\n\n\n\n<p>\u30c1\u30e3\u30ec\u30f3\u30b8\u306e\u30eb\u30fc\u30eb<\/p>\n\n\n\n<p>Tecnomatix\u30d7\u30e9\u30f3\u30c8\u30b7\u30df\u30e5\u30ec\u30fc\u30b7\u30e7\u30f3\u3092\u4f7f\u7528\u3057\u3066\u3001\u4e0e\u3048\u3089\u308c\u305f\u30bf\u30b9\u30af\u3092\u767b\u9332\u3057\u3066\u89e3\u6c7a\u3057\u307e\u3059\u3002\u4eca\u3059\u3050\u3042\u306a\u305f\u306e\u7121\u6599\u306e\u5b66\u751f\u306e\u30b3\u30d4\u30fc\u3092\u30c0\u30a6\u30f3\u30ed\u30fc\u30c9\u3057 <a href=\"https:\/\/www.plm.automation.siemens.com\/global\/en\/our-story\/partners\/academic\/student-software.html\" target=\"_blank\" rel=\"noopener\">\u3066\u304f\u3060\u3055\u3044 \u8a73\u7d30\u306f\u3053\u3061\u3089<\/a>!<\/p>\n\n\n\n<p>\u8cde\uff1a<\/p>\n\n\n\n<p>1\u4f4d\u306e\u52dd\u8005\u306f\u3001Microsoft Surface\u30bf\u30c3\u30c1\u30b9\u30af\u30ea\u30fc\u30f3\u30d9\u30fc\u30b9\u306e\u30b3\u30f3\u30d4\u30e5\u30fc\u30bf\u3092\u53d7\u3051\u53d6\u308a\u307e\u3059!2\u4f4d\u306f\u5f37\u529b\u306aBluetooth\u30ef\u30a4\u30e4\u30ec\u30b9\u30b9\u30d4\u30fc\u30ab\u30fc\u30013\u4f4d\u306f\u30b9\u30de\u30fc\u30c8\u30a6\u30a9\u30c3\u30c1\u3067\u3059\u3002<\/p>\n\n\n\n<p>\u5408\u7406\u7684\u306a\u30bd\u30ea\u30e5\u30fc\u30b7\u30e7\u30f3\u3092\u6301\u3064\u3059\u3079\u3066\u306e\u53c2\u52a0\u8005\u306b\u306f\u3001\u30d7\u30e9\u30f3\u30c8\u30b7\u30df\u30e5\u30ec\u30fc\u30b7\u30e7\u30f3\u30c1\u30e3\u30ec\u30f3\u30b8\u306e\u53c2\u52a0\u8005\u3068\u3057\u3066\u3042\u306a\u305f\u3092\u8a8d\u3081\u308b\u30c7\u30b8\u30bf\u30eb\u30d0\u30c3\u30b8\u304c\u8d08\u3089\u308c\u307e\u3059\u3002<\/p>\n\n\n\n<p><a href=\"https:\/\/ecosystem.siemens.com\/softwareforinnovators\/plant-simulation\/overview\" target=\"_blank\" rel=\"noreferrer noopener\">\u56db\u534a\u671f\u3054\u3068\u306e\u30c1\u30e3\u30ec\u30f3\u30b8\u306b\u4eca\u3059\u3050\u767b\u9332\u3057\u307e\u3057\u3087\u3046!\u2192<\/a><\/p>\n\n\n\n<p>\u3053\u306e\u30bd\u30ea\u30e5\u30fc\u30b7\u30e7\u30f3\u306f\u3001Tecnomatix Plant Simulation\u3092\u4f7f\u7528\u3057\u3066\u89e3\u6c7a\u3059\u308b\u5fc5\u8981\u304c\u3042\u308a\u307e\u3059\u3002<br>\u30b7\u30fc\u30e1\u30f3\u30b9\u30fb\u30c7\u30b8\u30bf\u30eb\u30fb\u30a4\u30f3\u30c0\u30b9\u30c8\u30ea\u30fc\u30ba\u30fb\u30bd\u30d5\u30c8\u30a6\u30a7\u30a2\u304a\u3088\u3073\u305d\u306e\u30d3\u30b8\u30cd\u30b9\u30fb\u30d1\u30fc\u30c8\u30ca\u30fc\u4ee5\u5916\u306e\u65b9\u3082\u3054\u53c2\u52a0\u3044\u305f\u3060\u3051\u307e\u3059\u3002<br>\u91cd\u8981\u306a\u65e5\u4ed8<br>\u30bf\u30b9\u30af\u306e\u767a\u8868:2022\u5e747\u670811\u65e5<br>\u63d0\u51fa\u671f\u9650:2022\u5e749\u670830\u65e5<\/p>\n\n\n<div class=\"wp-block-buttons\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link\" href=\"https:\/\/www.plm.automation.siemens.com\/plmapp\/education\/plant-simulation\/en_us\/free-software\/student\" target=\"_blank\" rel=\"noopener\">Tecnomatix Plant Simulation Student Download<\/a><\/div>\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link\" href=\"https:\/\/ecosystem.siemens.com\/softwareforinnovators\/plant-simulation-challenge-task-2\/overview\" target=\"_blank\" rel=\"noopener\">Participate in the Plant Simulation Challenge<\/a><\/div>\n<\/div>\n<div>&nbsp;<\/div>\n<div>&nbsp;<\/div>\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link\" href=\"https:\/\/www.linkedin.com\/groups\/9163979\/\" target=\"_blank\" rel=\"noreferrer noopener\">Plant Simulation in LinkedIn<\/a><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The Plant Simulation Student Challenge starts into round two:<br \/>\nThis Challenge is intended for students and professors in academics, university, learning and education.<\/p>\n","protected":false},"author":55895,"featured_media":6756,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"spanish_translation":"","french_translation":"","german_translation":"","italian_translation":"","polish_translation":"","japanese_translation":"","chinese_translation":"","footnotes":""},"categories":[160],"tags":[6610,6612,6614,531,31,10,6613,6596,6601,6611,225,6609],"industry":[113,114,115,129,127],"product":[352],"coauthors":[545],"class_list":["post-6753","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-learning-resources","tag-accademic","tag-award","tag-challenge","tag-digital-manufacturing","tag-digital-twin","tag-plant-simulation","tag-price","tag-siemens","tag-siemens-digital-industries-software","tag-student","tag-tecnomatix","tag-university","industry-automotive-transportation","industry-automotive-oems","industry-automotive-suppliers","industry-electronic-manufacturing-services","industry-electronics-semiconductors","product-plant-simulation"],"featured_image_url":"https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/7\/2022\/07\/plant_sim_challenge.png","_links":{"self":[{"href":"https:\/\/blogs.sw.siemens.com\/tecnomatix\/wp-json\/wp\/v2\/posts\/6753","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.sw.siemens.com\/tecnomatix\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.sw.siemens.com\/tecnomatix\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/tecnomatix\/wp-json\/wp\/v2\/users\/55895"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/tecnomatix\/wp-json\/wp\/v2\/comments?post=6753"}],"version-history":[{"count":5,"href":"https:\/\/blogs.sw.siemens.com\/tecnomatix\/wp-json\/wp\/v2\/posts\/6753\/revisions"}],"predecessor-version":[{"id":6810,"href":"https:\/\/blogs.sw.siemens.com\/tecnomatix\/wp-json\/wp\/v2\/posts\/6753\/revisions\/6810"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/tecnomatix\/wp-json\/wp\/v2\/media\/6756"}],"wp:attachment":[{"href":"https:\/\/blogs.sw.siemens.com\/tecnomatix\/wp-json\/wp\/v2\/media?parent=6753"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/tecnomatix\/wp-json\/wp\/v2\/categories?post=6753"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/tecnomatix\/wp-json\/wp\/v2\/tags?post=6753"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/tecnomatix\/wp-json\/wp\/v2\/industry?post=6753"},{"taxonomy":"product","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/tecnomatix\/wp-json\/wp\/v2\/product?post=6753"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/tecnomatix\/wp-json\/wp\/v2\/coauthors?post=6753"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}