{"id":7058,"date":"2021-03-01T13:03:22","date_gmt":"2021-03-01T18:03:22","guid":{"rendered":"https:\/\/blogs.sw.siemens.com\/teamcenter\/?p=7058"},"modified":"2026-03-26T08:50:42","modified_gmt":"2026-03-26T12:50:42","slug":"the-impact-of-poor-asset-information-handover","status":"publish","type":"post","link":"https:\/\/blogs.sw.siemens.com\/teamcenter\/the-impact-of-poor-asset-information-handover\/","title":{"rendered":"The impact of poor asset information handover"},"content":{"rendered":"\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"684\" src=\"https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/14\/2021\/03\/asset-information-handover-2-1024x684.png\" alt=\"\" class=\"wp-image-7071\" srcset=\"https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/14\/2021\/03\/asset-information-handover-2-1024x684.png 1024w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/14\/2021\/03\/asset-information-handover-2-600x401.png 600w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/14\/2021\/03\/asset-information-handover-2-768x513.png 768w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/14\/2021\/03\/asset-information-handover-2-900x601.png 900w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/14\/2021\/03\/asset-information-handover-2.png 1465w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>Asset Information Handover<\/figcaption><\/figure><\/div>\n\n\n\n<p class=\"has-drop-cap\">The lifecycle of a plant or facility can be upwards of 50 plus years!  During this time, the facility will undergo many types of projects &#8211; from yearly turnarounds and small retrofits to a major capital expansion. At any one time, an operating facility can have up to 500 projects on the go. It could be as small as changing a pump or repairing a vessel, or it could be much larger like a $1B debottlenecking project.<strong> So, what is the impact of poor asset information handover at the end of your brownfield or greenfield capital projects?  The answer is the loss of <span style=\"text-decoration: underline;\">significant<\/span> capital expenditures (CAPEX) as well as lost labor productivity &amp; equipment availability.<\/strong><\/p>\n\n\n\n<p>Studies from the industry group, FIATECH, in the early 2000s found that facility Owner-Operators (O\/O&#8217;s) spent an estimated 2-4% of the project cost to manually correct and key in required operations and maintenance (O&amp;M) information into their O&amp;M systems, such as their ERP, CMMS and\/or EAM system.  <strong>In a $300M dollar project, this equates to $6-$12M of hidden data entry and validation costs!<\/strong>  One of the primary drivers behind this cost is the occurrence of a single &#8220;data dump&#8221; of information by the contractor at the end of the project.  The good news is that the same FIATECH studies showed that with a periodic, more automated handover methodology it is possible for O\/O&#8217;s to save 60% of those costs.<\/p>\n\n\n\n<p>Now, let&#8217;s turn our attention to the impact of poor asset information handover on your equipment availability.  Availability relies on the field maintenance crew&#8217;s ability to implement and execute effective maintenance strategies &#8211; such as condition-based maintenance or reliability-centered maintenance.  <strong>These strategies rely on data integrity and consistency to increase equipment uptime.<\/strong>  When equipment is flagged for maintenance work, crews need to react quickly and with the confidence that the equipment information is up-to-date, the availability of spare parts is accurately represented and the work order clearly provides the scope of the work to be performed &amp; how to complete it.  A computerized maintenance management system (CMMS) or enterprise asset management (EAM) system will help with most of these aspects but only if there is a <strong>continuous digital handover methodology<\/strong> in place to ensure new project information is properly incorporated and made available. <\/p>\n\n\n\n<p>To highlight the importance of accurate information, a <a href=\"https:\/\/www.mckinsey.com\/industries\/electric-power-and-natural-gas\/our-insights\/unlocking-the-full-power-of-automation-in-industrials\" target=\"_blank\" rel=\"noreferrer noopener\">2019 McKinsey and Company report<\/a> found only 25% of wrench time (direct maintenance activity) at the surveyed power plant added value!&nbsp; That is astounding.  Contributing to this is the fact that facilities are constantly evolving,  highlighting the importance of managing this change and automating the processes which help keep your CMMS\/EAM system a trusted source of asset information to support direct maintenance activities.  The same Mckinsey report identified that value-added wrench time can be doubled by automating repetitive work like data entry or verifying system trends!  Combining this type of <strong>field maintenance process automation<\/strong> with a streamlined and <strong>automated &#8220;continuous digital handover&#8221; methodology<\/strong> is critical to addressing the loss of CAPEX budget defined earlier as well as addressing OPEX issues around productivity and the resulting equipment availability.<\/p>\n\n\n\n<p class=\"has-text-align-center has-large-font-size\">Want to learn more about Siemens ability to automate these processes?  Start your journey by checking out our latest infographic below.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><a href=\"https:\/\/www.plm.automation.siemens.com\/global\/en\/resource\/asset-information-handover\/94101\" target=\"_blank\" rel=\"noopener\"><img loading=\"lazy\" decoding=\"async\" width=\"709\" height=\"490\" src=\"https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/14\/2021\/03\/asset-information-handover.png\" alt=\"\" class=\"wp-image-7066\" srcset=\"https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/14\/2021\/03\/asset-information-handover.png 709w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/14\/2021\/03\/asset-information-handover-600x415.png 600w\" sizes=\"auto, (max-width: 709px) 100vw, 709px\" \/><\/a><figcaption>Asset Information Handover Infographic<\/figcaption><\/figure><\/div>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The lifecycle of a plant or facility can be upwards of 50 plus years! During this time, the facility will&#8230;<\/p>\n","protected":false},"author":10559,"featured_media":7071,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"spanish_translation":"","french_translation":"","german_translation":"","italian_translation":"","polish_translation":"","japanese_translation":"","chinese_translation":"","footnotes":""},"categories":[1],"tags":[57,22],"industry":[99],"product":[],"coauthors":[],"class_list":["post-7058","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-capital-asset-lifecycle-management","tag-service-lifecycle-management","industry-energy-utilities"],"featured_image_url":"https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/14\/2021\/03\/asset-information-handover-2.png","_links":{"self":[{"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/posts\/7058","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/users\/10559"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/comments?post=7058"}],"version-history":[{"count":5,"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/posts\/7058\/revisions"}],"predecessor-version":[{"id":7080,"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/posts\/7058\/revisions\/7080"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/media\/7071"}],"wp:attachment":[{"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/media?parent=7058"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/categories?post=7058"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/tags?post=7058"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/industry?post=7058"},{"taxonomy":"product","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/product?post=7058"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/coauthors?post=7058"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}