{"id":16501,"date":"2023-09-27T11:46:58","date_gmt":"2023-09-27T15:46:58","guid":{"rendered":"https:\/\/blogs.sw.siemens.com\/teamcenter\/?p=16501"},"modified":"2026-03-26T08:59:08","modified_gmt":"2026-03-26T12:59:08","slug":"wind-turbine-plm","status":"publish","type":"post","link":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wind-turbine-plm\/","title":{"rendered":"\ud83d\udca8 streamline wind turbine development"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">ENERCON uses Teamcenter Product Configurator<\/h2>\n\n\n\n<p>The wind industry is characterized by its dynamic market conditions, accelerated pace of technological advancements, and increasing demands for customization. To stay competitive in this space, companies need effective ways to manage their highly complex product line, meet customer demands for customization, and reduce lead times from order to quotation.<\/p>\n\n\n\n<p><a href=\"https:\/\/www.enercon.de\/en\/home\/\" target=\"_blank\" rel=\"noreferrer noopener\">ENERCON<\/a> has been in the wind turbines industry for over 35 years developing, producing, installing, and maintaining wind turbines. To further streamline its operations and enhance variability management, ENERCON partnered with Siemens Digital Industries Software to adopt <a href=\"https:\/\/plm.sw.siemens.com\/en-US\/teamcenter\/\" target=\"_blank\" rel=\"noreferrer noopener\">Teamcenter\u00ae<\/a> software and specifically <a href=\"https:\/\/plm.sw.siemens.com\/en-US\/teamcenter\/solutions\/product-configuration-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">Teamcenter Product Configurator<\/a>. <\/p>\n\n\n\n<p>Teamcenter is part of the <a href=\"https:\/\/www.siemens.com\/global\/en\/company\/digital-transformation\/xcelerator.html\" target=\"_blank\" rel=\"noreferrer noopener\">Siemens Xcelerator<\/a> business platform of software, hardware and services.<\/p>\n\n\n\n<div style=\"height:24px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">A modern approach to variability management<\/h2>\n\n\n\n<p>ENERCON embarked on a search for a solution that would integrate a common product configuration definition across its design BOM (DBOM), engineering BOM (EBOM), and manufacturing BOM (MBOM), serving as a reliable source of truth for its entire value chain. Implementing Teamcenter Product Configurator allowed ENERCON to bring together variability data from their BOMs and consider the holistic value chain perspective.<\/p>\n\n\n\n<p>With Product Configurator in production, they are now achieving significant improvements in process efficiency, collaboration and time-to-market, while also aligning their <a href=\"https:\/\/plm.sw.siemens.com\/en-US\/teamcenter\/solutions\/bom-bill-of-materials-management\/\" target=\"_blank\" rel=\"noreferrer noopener\">bill-of-materials (BOM) management<\/a> and expanding their capabilities for future growth.<\/p>\n\n\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Leveraging variability management in next generation turbines<\/h2>\n\n\n\n<p>Teamcenter Product Configurator provided ENERCON with valid and buildable product configurations. ENERCON leveraged these capabilities to configure its products early in the development process, eliminating the need for downstream configuration changes in its enterprise resource planning (ERP) system. With access to valuable data within Teamcenter, ENERCON\u2019s engineers can easily validate the feasibility of different configurations of wind turbines, ensuring that all combinations were valid and buildable.<\/p>\n\n\n\n<p>This effort coincides with ENERCON\u2019s latest project, the development of the E-175 EP5 wind turbine. This turbine has one of the largest rotor diameters for onshore turbines right now. ENERCON plans to continue applying this variability management approach in the development of the new evolution of their turbine, the E-175 EP5 E2, which will be available in 2026.<\/p>\n\n\n\n<div style=\"height:29px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-image size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"701\" src=\"https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/14\/2023\/09\/E-175-EP5-E2-1024x701.jpg\" alt=\"wind turbine\" class=\"wp-image-16506\" style=\"width:840px;height:575px\" srcset=\"https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/14\/2023\/09\/E-175-EP5-E2-1024x701.jpg 1024w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/14\/2023\/09\/E-175-EP5-E2-600x411.jpg 600w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/14\/2023\/09\/E-175-EP5-E2-768x526.jpg 768w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/14\/2023\/09\/E-175-EP5-E2-1536x1052.jpg 1536w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/14\/2023\/09\/E-175-EP5-E2-2048x1402.jpg 2048w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/14\/2023\/09\/E-175-EP5-E2-900x616.jpg 900w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Single source of variability enables a revamped operating model<\/h2>\n\n\n\n<p>Configuration management will be integral to improving the company\u2019s engineering change management processes. ENERCON plans to convert their operating model from a made-to-stock and engineer-to-order approach to a CTO+E approach. This model incorporates more repeatability and reuse into the business model while still supporting client customization. This will allow ENERCON to better control fast-track changes such as health and safety execution (HSE) topics, supplier discontinuity, part obsolescence and missing part topics. By implementing a CTO+E approach, changes would be able to be applied to any product variant at any time between revision packages. <\/p>\n\n\n\n<p>Using this engineering change management process with a common variability backbone, ENERCON will have the ability to adapt their BOMs and manufacturing processes quickly without jeopardizing the supply chain management processes in their plants.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>\u201cThe Teamcenter Product Configurator is an important part of our global PLM strategy. By leveraging a single source of truth for multi-disciplinary product configuration data across the entire product lifecycle, ENERCON is positioned to remain at the forefront of technological advancements in the wind energy industry.\u201d<\/p>\n<cite>Sebastian Heinzel, ENERCON, R&amp;D Center of Excellence, Product Owner, Senior Consultant PLM<\/cite><\/blockquote>\n\n\n\n<div style=\"height:31px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Looking forward &#8211; improving the manufacturing process<\/h2>\n\n\n\n<p>ENERCON plans to further leverage Siemens solutions for MBOM, SBOM and digital manufacturing. By expanding its use of Siemens solutions, ENERCON is aiming to enhance its manufacturing processes, improve serviceability, and stay at the forefront of technological advancements in the wind energy industry.<\/p>\n\n\n\n<p>ENERCON is in the concept phase of a PLM program that will bring both Engineering BOM and Manufacturing BOM configuration management into Teamcenter. This will enable them to deploy highly sophisticated discrete manufacturing processes. With the help of Teamcenter, ENERCON\u2019s goal is to perform pre-planning up to 36 months in advance of manufacturing and work with scheduling agreements showing early demands to the suppliers. This will allow them to make changes to product variants holistically across all platforms, plants, systems, and processes, including pre-planning. An integrated PLM configuration management solution also helps ensure stable high-volume production without line stops while avoiding the use of obsolete materials or high numbers of part stocks.<\/p>\n\n\n\n<p>Learn how you can utilize integrated BOM management capabilities to configure, manage and re-use different design options and variants.&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Read the full customer success story: <a href=\"https:\/\/resources.sw.siemens.com\/en-US\/case-study-enercon\" target=\"_blank\" rel=\"noopener\">https:\/\/resources.sw.siemens.com\/en-US\/case-study-enercon<\/a><\/li>\n\n\n\n<li>Watch the on-demand webinar: <a href=\"https:\/\/webinars.sw.siemens.com\/en-US\/product-variability-management-with-plm\/\" target=\"_blank\" rel=\"noopener\">https:\/\/webinars.sw.siemens.com\/en-US\/product-variability-management-with-plm\/<\/a><\/li>\n<\/ul>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Are you ready for cloud PLM?<\/h2>\n\n\n\n<div style=\"height:16px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-teal-color has-alpha-channel-opacity has-teal-background-color has-background is-style-wide\"\/>\n\n\n\n<p class=\"has-text-align-center\" style=\"font-size:21px\"><strong>Start fast and grow with <a href=\"https:\/\/www.siemens.com\/en-us\/products\/teamcenter\/teamcenter-x-cloud-plm\/\" target=\"_blank\" rel=\"noreferrer noopener\">Teamcenter X<\/a>   |   Make smarter decisions with <a href=\"https:\/\/blogs.sw.siemens.com\/teamcenter\/tag\/artificial-intelligence\/\" target=\"_blank\" rel=\"noreferrer noopener\">AI-powered PLM<\/a> <\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-teal-color has-alpha-channel-opacity has-teal-background-color has-background is-style-wide\"\/>\n\n\n\n<div class=\"wp-block-buttons alignwide is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-16018d1d wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button has-custom-width wp-block-button__width-50 is-style-fill\"><a class=\"wp-block-button__link has-white-color has-cyan-background-color has-text-color has-background has-text-align-center has-custom-font-size wp-element-button\" href=\"https:\/\/plm.sw.siemens.com\/en-US\/teamcenter\/\" style=\"border-radius:57px;font-size:30px\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Teamcenter Solutions<\/strong><\/a><\/div>\n\n\n\n<div class=\"wp-block-button has-custom-width wp-block-button__width-50 is-style-fill\"><a class=\"wp-block-button__link has-white-color has-cyan-background-color has-text-color has-background has-custom-font-size wp-element-button\" href=\"https:\/\/plm.sw.siemens.com\/en-US\/teamcenter\/trials\/\" style=\"border-radius:57px;font-size:30px\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>30-day trial<\/strong><\/a><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Discover how ENERCON used Teamcenter Product Configurator to streamline wind turbine development. <\/p>\n","protected":false},"author":84758,"featured_media":16505,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"spanish_translation":"","french_translation":"","german_translation":"","italian_translation":"","polish_translation":"","japanese_translation":"","chinese_translation":"","footnotes":""},"categories":[123,51],"tags":[4,31450,31431],"industry":[99,103],"product":[357],"coauthors":[20988],"class_list":["post-16501","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-customer-success-story","category-featured","tag-bom-management","tag-product-configuration-management","tag-variability","industry-energy-utilities","industry-equipment-manufacturer","product-teamcenter"],"featured_image_url":"https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/14\/2023\/09\/KLaas-Eissens_E138EP3-Wieringerwerf-192-RET-scaled.jpg","_links":{"self":[{"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/posts\/16501","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/users\/84758"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/comments?post=16501"}],"version-history":[{"count":5,"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/posts\/16501\/revisions"}],"predecessor-version":[{"id":16593,"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/posts\/16501\/revisions\/16593"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/media\/16505"}],"wp:attachment":[{"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/media?parent=16501"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/categories?post=16501"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/tags?post=16501"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/industry?post=16501"},{"taxonomy":"product","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/product?post=16501"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/teamcenter\/wp-json\/wp\/v2\/coauthors?post=16501"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}