{"id":317,"date":"2022-04-15T12:13:12","date_gmt":"2022-04-15T16:13:12","guid":{"rendered":"https:\/\/blogs.sw.siemens.com\/small-medium-business\/?p=317"},"modified":"2026-03-26T15:40:08","modified_gmt":"2026-03-26T19:40:08","slug":"earlier-requirements-verification-with-alm","status":"publish","type":"post","link":"https:\/\/blogs.sw.siemens.com\/small-medium-business\/2022\/04\/15\/earlier-requirements-verification-with-alm\/","title":{"rendered":"Avoiding rework in electronics design with earlier requirements verification"},"content":{"rendered":"\n<p>When electronics manufacturers can validate and verify the design and development of products sooner in the design process, they avoid higher costs required with refinement and rework. But how do manufacturers move validation and verification earlier in the design process?<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Using ALM for comprehensive cross-team, project and system workflows<\/h2>\n\n\n\n<p>With concurrent product design, the collaboration between disciplines can happen at any design phase. This concurrent process leverages a unified lifecycle solution that naturally shifts the requirements and verification earlier in the design process, as shown below.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"304\" src=\"https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/39\/2022\/04\/blog-shift-left-1024x304.png\" alt=\"Charts showing the ideal and not ideal design situations by person hours invested. In the shift left scenario, fewer person hours are needed.\" class=\"wp-image-319\" srcset=\"https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/39\/2022\/04\/blog-shift-left-1024x304.png 1024w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/39\/2022\/04\/blog-shift-left-600x178.png 600w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/39\/2022\/04\/blog-shift-left-768x228.png 768w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/39\/2022\/04\/blog-shift-left-900x267.png 900w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/39\/2022\/04\/blog-shift-left.png 1425w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>This helps to avoid rework in later design stages by:<\/p>\n\n\n\n<ol class=\"wp-block-list\" type=\"1\"><li>Improving speed with an integrated system linking requirements to manufacturing<\/li><li>Reducing non-value add tasks with unified and planned requirement and verification workflows<\/li><li>Decreasing repetitive work by reusing templates and collections of requirements<\/li><\/ol>\n\n\n\n<p>Learn more about shifting left and how electronics manufacturers can use ALM for requirements management and traceability.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-background\" href=\"https:\/\/www.plm.automation.siemens.com\/global\/en\/webinar\/polarion-alm-application-lifecycle-mangement-software-chip-to-city\/106198\" style=\"border-radius:10px;background:linear-gradient(180deg,rgb(78,188,188) 0%,rgb(6,153,201) 100%)\" target=\"_blank\" rel=\"noopener\">Watch the webinar<\/a><\/div>\n<\/div>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>When electronics manufacturers can validate and verify the design and development of products sooner in the design process, they avoid&#8230;<\/p>\n","protected":false},"author":79501,"featured_media":320,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"spanish_translation":"","french_translation":"","german_translation":"","italian_translation":"","polish_translation":"","japanese_translation":"","chinese_translation":"","footnotes":""},"categories":[1],"tags":[26,36,37,35],"industry":[],"product":[],"coauthors":[18],"class_list":["post-317","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-alm","tag-chip-to-city","tag-electronics-design","tag-requirements-verification"],"featured_image_url":"https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/39\/2022\/04\/IC-Device-Package-Design-27-94371.jpg","_links":{"self":[{"href":"https:\/\/blogs.sw.siemens.com\/small-medium-business\/wp-json\/wp\/v2\/posts\/317","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.sw.siemens.com\/small-medium-business\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.sw.siemens.com\/small-medium-business\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/small-medium-business\/wp-json\/wp\/v2\/users\/79501"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/small-medium-business\/wp-json\/wp\/v2\/comments?post=317"}],"version-history":[{"count":3,"href":"https:\/\/blogs.sw.siemens.com\/small-medium-business\/wp-json\/wp\/v2\/posts\/317\/revisions"}],"predecessor-version":[{"id":325,"href":"https:\/\/blogs.sw.siemens.com\/small-medium-business\/wp-json\/wp\/v2\/posts\/317\/revisions\/325"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/small-medium-business\/wp-json\/wp\/v2\/media\/320"}],"wp:attachment":[{"href":"https:\/\/blogs.sw.siemens.com\/small-medium-business\/wp-json\/wp\/v2\/media?parent=317"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/small-medium-business\/wp-json\/wp\/v2\/categories?post=317"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/small-medium-business\/wp-json\/wp\/v2\/tags?post=317"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/small-medium-business\/wp-json\/wp\/v2\/industry?post=317"},{"taxonomy":"product","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/small-medium-business\/wp-json\/wp\/v2\/product?post=317"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/small-medium-business\/wp-json\/wp\/v2\/coauthors?post=317"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}