{"id":4259,"date":"2017-09-12T05:11:33","date_gmt":"2017-09-12T12:11:33","guid":{"rendered":"https:\/\/blogs.plm.automation.siemens.com\/t5\/Simcenter-Blog\/Ready-to-challenge-your-traditional-engineering-with-MBSE\/ba-p\/423095"},"modified":"2026-03-26T05:56:34","modified_gmt":"2026-03-26T09:56:34","slug":"ready-to-challenge-your-traditional-engineering-with-mbse","status":"publish","type":"post","link":"https:\/\/blogs.sw.siemens.com\/simcenter\/ready-to-challenge-your-traditional-engineering-with-mbse\/","title":{"rendered":"Ready to challenge your traditional engineering with MBSE"},"content":{"rendered":"<p><P><SPAN>Many companies have well-defined processes and tools that have been optimized for decades by dedicated resources and throughout specific projects. It\u2019s not obvious to suddenly question those and come up with something new. That requires strong arguments based on solid evidence.<\/SPAN><\/P><\/p>\n<p><P><SPAN>In addition to that, as traditional engineering is often test-centric as opposed to model-centric, the point is hard to make. Because, let\u2019s be honest, what could be more convincing than having a real physical prototype in hands and test it?<\/SPAN><\/P><\/p>\n<p><P><SPAN><span class=\"lia-inline-image-display-wrapper lia-image-align-center\" style=\"width: 999px;\"><img decoding=\"async\" src=\"http:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/6\/2019\/09\/Simulation-Test-balance-in-traditional-engineering-1.png\" alt=\"Simulation-Test balance in traditional engineering.png\" title=\"Simulation-Test balance in traditional engineering.png\" \/><span class=\"lia-inline-image-caption\" onclick=\"event.preventDefault();\">Simulation-Test balance in traditional engineering<\/span><\/span><\/SPAN><\/P><br \/>\n<P>And furthermore, companies these days are already overloaded with all these new methods such as <a title=\"Model-based Systems Engineering\" href=\"https:\/\/www.plm.automation.siemens.com\/global\/en\/our-story\/glossary\/model-based-systems-engineering\/28573\" target=\"_blank\" rel=\"noopener nofollow noreferrer\">MBSE<\/A>, but also systems engineering, application engineering, crowdsourcing, agile, design thinking and more. So how to make such paradigm shifts without damaging business, impacting resources and changing the company culture?<\/P><\/p>\n<p><P>Taking all these complexities into consideration, the best advice I can give you is to put MBSE next to your <a title=\"Current Challenges in Autonomous Vehicle Development\" href=\"https:\/\/www.plm.automation.siemens.com\/global\/en\/topic\/current-challenges-in-autonomous-vehicle-development\/60563\" target=\"_blank\" rel=\"noopener nofollow noreferrer\">current process<\/A> and give it a try. It may sound like a waste of time and money, but only by running a project in the traditional way while running the same project in parallel using MBSE as implemented in Simcenter, you can truly form yourself an opinion based on facts.<\/P><\/p>\n<p><P><span class=\"lia-inline-image-display-wrapper lia-image-align-center\" style=\"width: 999px;\"><img decoding=\"async\" src=\"http:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/6\/2019\/09\/Simulation-Test-balance-in-MBSE-1.png\" alt=\"Simulation-Test balance in MBSE.png\" title=\"Simulation-Test balance in MBSE.png\" \/><span class=\"lia-inline-image-caption\" onclick=\"event.preventDefault();\">Simulation-Test balance in MBSE<\/span><\/span><\/P><br \/>\n<P>The extra effort of executing the same project twice will anyway bring you lots of benefits:<\/P><br \/>\n<UL><br \/>\n<LI>You will have the <STRONG>right metrics<\/STRONG> in hand to estimate the potential relative cost and time savings after having an MBSE process implemented<\/LI><br \/>\n<LI>You could potentially reach a <STRONG>system-optimized end-product that you could compare feature-wise with your traditional engineering end-product, <\/STRONG>hence building trust in MBSE<\/LI><br \/>\n<LI>You would <STRONG>potentially reach the market faster with the MBSE project<\/STRONG>, which would bring quicker return on the investment of running two projects in parallel<\/LI><br \/>\n<\/UL><br \/>\n<P>And of course we can help you. <STRONG>We can offer you scalable support from engineering services professionals.<\/STRONG><\/P><\/p>\n<p><P>Several customers have already been able to quantify the benefits of MBSE using Simcenter tools. Among many others, <a href=\"https:\/\/www.plm.automation.siemens.com\/fr\/about_us\/success\/case_study.cfm?Component=223523&amp;ComponentTemplate=1481\" target=\"_blank\" rel=\"noopener nofollow noreferrer\"><STRONG>Renault SA<\/STRONG><\/A> has divided the development time of its automated manual transmission by 2, <a href=\"https:\/\/www.plm.automation.siemens.com\/fr\/about_us\/success\/case_study.cfm?Component=228145&amp;ComponentTemplate=1481\" target=\"_blank\" rel=\"noopener nofollow noreferrer\"><STRONG>Airbus Helicopters<\/STRONG><\/A> has decreased its prototype costs by a factor 4 and <a href=\"https:\/\/www.plm.automation.siemens.com\/fr\/about_us\/success\/case_study.cfm?Component=230965&amp;ComponentTemplate=1481\" target=\"_blank\" rel=\"noopener nofollow noreferrer\"><STRONG>MAN Diesel &amp; Turbo<\/STRONG><\/A> has reduced the development time for new fuel injection systems by a factor 5.<span class=\"lia-inline-image-display-wrapper lia-image-align-center\" style=\"width: 999px;\"><img decoding=\"async\" src=\"http:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/6\/2019\/09\/Benefits-of-MBSE-1.png\" alt=\"Benefits of MBSE.png\" title=\"Benefits of MBSE.png\" \/><span class=\"lia-inline-image-caption\" onclick=\"event.preventDefault();\">Benefits of MBSE<\/span><\/span><\/P><br \/>\n<P>So are you ready to do the comparison? Are you prepared to assess the accuracy and speed of both your traditional engineering process and MBSE, and see which one will win the competition? We are more than ready to provide you with all the necessary information and help.<\/P><\/p>\n<p><P>As a first step in your process, watch this 40-minutes webinar : <a href=\"https:\/\/www.plm.automation.siemens.com\/en\/campaigns\/single_topic.cfm?Component=255835&amp;ComponentTemplate=186312\" target=\"_blank\" rel=\"noopener nofollow noreferrer\">Introduction to the fundamentals of model-based systems engineering<\/A><\/P><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Many companies have well-defined processes and tools that have been optimized for decades by dedicated resources and throughout specific projects. It\u2019s not obvious to suddenly question those and come&#8230;<\/p>\n","protected":false},"author":40174,"featured_media":4268,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"spanish_translation":"","french_translation":"","german_translation":"","italian_translation":"","polish_translation":"","japanese_translation":"","chinese_translation":"","footnotes":""},"categories":[1,184],"tags":[16],"industry":[],"product":[590],"coauthors":[],"class_list":["post-4259","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-webinar","tag-system-simulation","product-simcenter-amesim"],"featured_image_url":"https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/6\/2019\/09\/Benefits-of-MBSE-1.png","_links":{"self":[{"href":"https:\/\/blogs.sw.siemens.com\/simcenter\/wp-json\/wp\/v2\/posts\/4259","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.sw.siemens.com\/simcenter\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.sw.siemens.com\/simcenter\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/simcenter\/wp-json\/wp\/v2\/users\/40174"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/simcenter\/wp-json\/wp\/v2\/comments?post=4259"}],"version-history":[{"count":4,"href":"https:\/\/blogs.sw.siemens.com\/simcenter\/wp-json\/wp\/v2\/posts\/4259\/revisions"}],"predecessor-version":[{"id":4269,"href":"https:\/\/blogs.sw.siemens.com\/simcenter\/wp-json\/wp\/v2\/posts\/4259\/revisions\/4269"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/simcenter\/wp-json\/wp\/v2\/media\/4268"}],"wp:attachment":[{"href":"https:\/\/blogs.sw.siemens.com\/simcenter\/wp-json\/wp\/v2\/media?parent=4259"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/simcenter\/wp-json\/wp\/v2\/categories?post=4259"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/simcenter\/wp-json\/wp\/v2\/tags?post=4259"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/simcenter\/wp-json\/wp\/v2\/industry?post=4259"},{"taxonomy":"product","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/simcenter\/wp-json\/wp\/v2\/product?post=4259"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/simcenter\/wp-json\/wp\/v2\/coauthors?post=4259"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}