{"id":48,"date":"2022-02-25T09:00:00","date_gmt":"2022-02-25T14:00:00","guid":{"rendered":"https:\/\/blogs.sw.siemens.com\/industrial-machinery\/?p=48"},"modified":"2026-03-26T15:54:01","modified_gmt":"2026-03-26T19:54:01","slug":"introducing-siemens-plm-for-machine-builders-available-now","status":"publish","type":"post","link":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/2022\/02\/25\/introducing-siemens-plm-for-machine-builders-available-now\/","title":{"rendered":"Introducing Siemens PLM for Machine Builders \u2014 Available Now!"},"content":{"rendered":"\n<p>Siemens <a href=\"https:\/\/www.plm.automation.siemens.com\/global\/en\/industries\/industrial-machinery-heavy-equipment\/industrial-machinery\/plm-machine-builders.html\" target=\"_blank\" rel=\"noreferrer noopener\">PLM for Machine Builders<\/a> offers a cost-effective way to access the advanced Product Lifecycle Management (PLM) capabilities of Teamcenter to companies that need to deliver complex ETO projects.<\/p>\n\n\n\n<p>And Siemens goes further \u2013 PLM for Machine Builders is an instant-on, cloud-based system that captures years of expertise in system deployment and configuration, giving you a ready-to-use integrated environment to manage requirements, project milestones, and product definition, along with advanced change and configuration management.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Benefits of PLM for Machine Builders<\/h2>\n\n\n\n<p>Fragmented IT systems. Siloed Excel sheets. Engineering workarounds that violate compliance. All these inefficiencies can be a thing of the past with cross-domain collaboration and digitalization.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large is-style-default\"><img decoding=\"async\" src=\"https:\/\/blogs.sw.siemens.com\/industrial-machinery\/wp-content\/uploads\/sites\/28\/2022\/02\/900.001_Image_Blog_PLMforMachineBuilders-1024x576.jpg\" alt=\"A robotic arm reaching to the moon.\" class=\"wp-image-49\" title=\"PLM for Machine Builders\" \/><figcaption>PLM for Machine Builders &#8211; A small investment for you. A giant leap for your business.<\/figcaption><\/figure>\n\n\n\n<p>PLM for Machine Builders is a single environment to hold all your project information to better control complexity and ensure orders are delivered with the latest customer requirements. Increase your competitive advantage by providing transparency of project information across your organization.<\/p>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<p><strong>Benefits:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Fully integrated solution means every stakeholder has exactly what they need to get their job done<\/li><li>Easily adapt your plan, understand the impact and implement change quickly, effectively, accurately<\/li><li>Dashboards, self-service reports, timelines and more ensure accurate, real time status information&nbsp;<\/li><li>Ability to act quickly by moving away from paper-based change processes<\/li><li>Capability to easily share design information across teams<\/li><li>SaaS delivery for anytime, anywhere access<\/li><\/ul>\n<\/div><\/div>\n\n\n\n<div style=\"height:33px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button aligncenter has-custom-width wp-block-button__width-25 has-custom-font-size has-medium-font-size\"><a class=\"wp-block-button__link\" href=\"https:\/\/www.plm.automation.siemens.com\/global\/en\/industries\/industrial-machinery-heavy-equipment\/industrial-machinery\/plm-machine-builders.html\" target=\"_blank\" rel=\"noreferrer noopener\">Learn more about PLM for Machine Builders<\/a><\/div>\n<\/div>\n\n\n\n<div style=\"height:33px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>PLM for Machine Builders incorporates three key areas: project, process, and requirements management; machine configuration and reuse; and blended ETO\/CTO.<\/p>\n\n\n\n<p>Our solution has been built to support your end-to-end business processes with a preconfigured offering capable of growing with you. Project management and design teams can collaborate and share work in progress (WIP) to define and complete the development processes. It includes built-in best practices for project management, change management, BoM cloning and modular product configuration.<\/p>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<p><strong>Features include:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Capture project milestones and associated deliverables<\/li><li>Integrated requirements drive the design<\/li><li>Streamlined change management processes<\/li><li>Google-style search to find all your information<\/li><li>Advanced BoM cloning capabilities independent of CAD<\/li><li>Document management \u2013 associate Microsoft Office documents to your designs<\/li><li>Capture product structure from CAD for downstream re-use<\/li><li>Advanced rule-based product configuration<\/li><\/ul>\n<\/div><\/div>\n\n\n\n<div style=\"height:33px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-image size-large is-style-default\"><img decoding=\"async\" src=\"https:\/\/blogs.sw.siemens.com\/industrial-machinery\/wp-content\/uploads\/sites\/28\/2022\/02\/900.001_Image2_Blog_PLMforMachineBuilders.jpg-1024x576.png\" alt=\"The product structure management within Teamcenter product lifecycle management software.\" class=\"wp-image-52\" title=\"PLM for machine builders product structure management\" \/><figcaption>PLM for Machine Builders Product Structure Management<\/figcaption><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Streamline your Engineer-to-Order process<\/h2>\n\n\n\n<p>Implement a SaaS PLM system that can be deployed quickly and cost-effectively for a rapid return on investment, while offering the full range of PLM solutions your company needs to shoot for the moon. Digitally boost product quality and speed to market with Siemens PLM for Machine Builders.<\/p>\n\n\n\n<p><a href=\"https:\/\/www.plm.automation.siemens.com\/global\/en\/industries\/industrial-machinery-heavy-equipment\/industrial-machinery\/plm-machine-builders.html\" target=\"_blank\" rel=\"noreferrer noopener\">Learn more about PLM for Machine Builders<\/a> and discover how your company can accelerate project delivery and accuracy. A free 30-day trial will also be available so you can see for yourself.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Siemens PLM for Machine Builders offers a cost-effective way to access the advanced Product Lifecycle Management (PLM) capabilities of Teamcenter&#8230;<\/p>\n","protected":false},"author":79498,"featured_media":62,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"spanish_translation":"","french_translation":"","german_translation":"","italian_translation":"","polish_translation":"","japanese_translation":"","chinese_translation":"","footnotes":""},"categories":[1],"tags":[74,435],"industry":[43,432],"product":[270],"coauthors":[415],"class_list":["post-48","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-software-as-a-service-saas","tag-teamcenter-x","industry-industrial-machinery","industry-industrial-machinery-heavy-equipment","product-teamcenter"],"_links":{"self":[{"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/wp\/v2\/posts\/48","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/wp\/v2\/users\/79498"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/wp\/v2\/comments?post=48"}],"version-history":[{"count":1,"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/wp\/v2\/posts\/48\/revisions"}],"predecessor-version":[{"id":867,"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/wp\/v2\/posts\/48\/revisions\/867"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/wp\/v2\/media?parent=48"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/wp\/v2\/categories?post=48"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/wp\/v2\/tags?post=48"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/wp\/v2\/industry?post=48"},{"taxonomy":"product","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/wp\/v2\/product?post=48"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/wp\/v2\/coauthors?post=48"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}