{"id":41,"date":"2022-02-18T10:21:43","date_gmt":"2022-02-18T15:21:43","guid":{"rendered":"https:\/\/blogs.sw.siemens.com\/industrial-machinery\/?p=41"},"modified":"2026-03-26T15:53:58","modified_gmt":"2026-03-26T19:53:58","slug":"4-benefits-to-machine-simulation-and-digital-prototyping","status":"publish","type":"post","link":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/2022\/02\/18\/4-benefits-to-machine-simulation-and-digital-prototyping\/","title":{"rendered":"4 benefits to machine simulation and digital prototyping"},"content":{"rendered":"\n<p>Machine building and design is <a href=\"https:\/\/blogs.sw.siemens.com\/industrial-machinery\/2022\/01\/05\/trends-driving-industrial-machinery-and-how-you-can-use-them-to-your-advantage\/\" target=\"_blank\" rel=\"noreferrer noopener\">constantly evolving<\/a> as industrial machinery companies are being asked to build flexible, customized machines without slowing their design process.<\/p>\n\n\n\n<p>The latest adaptation in this changing industry is integrated design and simulation, one of the <a href=\"https:\/\/blogs.sw.siemens.com\/industrial-machinery\/2022\/01\/12\/three-pillars-of-intelligent-performance-engineerin\" target=\"_blank\" rel=\"noreferrer noopener\">three pillars of Intelligent Performance Engineering<\/a> (IPE).<\/p>\n\n\n\n<p>The <a href=\"https:\/\/www.sw.siemens.com\/en-US\/digital-twin\/\" target=\"_blank\" rel=\"noreferrer noopener\">digital twin<\/a> is built on integrated design and simulation, in which all engineering disciplines capture simulation and validation results in a centralized repository.<\/p>\n\n\n\n<p><a href=\"https:\/\/blogs.sw.siemens.com\/industrial-machinery\/2022\/01\/26\/how-3-industrial-machinery-companies-used-intelligent-performance-engineering-to-revolutionize-their-processes\/\" target=\"_blank\" rel=\"noreferrer noopener\">Forward-thinking machine builders<\/a> who have integrated machine simulation and digital prototyping into their design processes have realized four major benefits to adopting this methodology.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"1-higher-quality-designs\">1. Higher quality designs<\/h2>\n\n\n\n<p>Supporting customer needs can be dramatically improved by re-using systems and components that test well, validate, and are proven to work.<\/p>\n\n\n\n<p>Integrating design and simulation in the same environment automates the information-sharing process and enhances interdisciplinary collaboration.<\/p>\n\n\n\n<p>And with a library of components built over decades, designers can use the combined engineering knowledge to simulate various what-if scenarios in the early design stage for improved designs overall.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"2-shorter-commissioning-time\">2. Shorter commissioning time<\/h2>\n\n\n\n<p>Design and simulation teams can simultaneously perform verification on digital twin numerical models within the cloud.<\/p>\n\n\n\n<p>By using the digital twin to assess a machine\u2019s final behavior in every available configuration, engineers can assure rapid installation and commissioning.<\/p>\n\n\n\n<p>All the testing that would normally take place after delivery has been done, and the customer can put their new piece of equipment into operation almost immediately.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"3-accurately-predicted-maintenance-needs\">3. Accurately predicted maintenance needs<\/h2>\n\n\n\n<p>Machine simulation and digital prototyping can also be used after the machine is in operation.<\/p>\n\n\n\n<p>The same digital prototypes design engineers use to predict machine reliability can also be used to determine the longevity of parts within the machine.<\/p>\n\n\n\n<p>Taking it a step further, IIoT data from the machine operation can be fed back into the digital prototype and combined with virtual sensor data.<\/p>\n\n\n\n<p>This information can then be used to accurately predict when a machine will need maintenance according to its usage.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"4-reduce-machine-downtime-in-the-field\">4. Reduce machine downtime in the field<\/h2>\n\n\n\n<p>By more accurately predicting machine maintenance, manufacturers can also reduce downtime.<\/p>\n\n\n\n<p>By using simulation and digital prototypes to more accurately predict maintenance needs, plant operators can schedule both necessary and preventative maintenance during scheduled downtime.<\/p>\n\n\n\n<p>In turn, this reduces the chances for any unplanned downtime and the need to find specialist field technicians at short notice.<\/p>\n\n\n\n<p>That way, machines are operating more reliably for longer and being more productive overall.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"integrated-machine-design-and-simulation-has-even-more-benefits\">Integrated machine design and simulation has even more benefits<\/h2>\n\n\n\n<p>Implementing simulation earlier in the design process identifies change when it is cheaper to implement, leads to faster commissioning during installation, and better productivity in operation.<\/p>\n\n\n\n<p>This is just a portion of what Intelligent Performance Engineering has to offer.<\/p>\n\n\n\n<p>Learn how integrated design and simulation connects to Intelligent Performance Engineering in our free white paper.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button has-custom-width wp-block-button__width-50 has-custom-font-size has-medium-font-size\"><a class=\"wp-block-button__link\" href=\"https:\/\/resources.sw.siemens.com\/en-US\/white-paper-integrated-machine-design-and-building-simulation-software\" style=\"border-radius:0px\" target=\"_blank\" rel=\"noopener\">Intelligent Performance Engineering: Integrated Design and Simulation<\/a><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Machine building and design is constantly evolving as industrial machinery companies are being asked to build flexible, customized machines without&#8230;<\/p>\n","protected":false},"author":79498,"featured_media":47,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"spanish_translation":"","french_translation":"","german_translation":"","italian_translation":"","polish_translation":"","japanese_translation":"","chinese_translation":"","footnotes":""},"categories":[1],"tags":[66,431,434],"industry":[43,432],"product":[],"coauthors":[415],"class_list":["post-41","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-digital-twin","tag-industrial-machinery","tag-machine-simulation","industry-industrial-machinery","industry-industrial-machinery-heavy-equipment"],"_links":{"self":[{"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/wp\/v2\/posts\/41","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/wp\/v2\/users\/79498"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/wp\/v2\/comments?post=41"}],"version-history":[{"count":1,"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/wp\/v2\/posts\/41\/revisions"}],"predecessor-version":[{"id":866,"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/wp\/v2\/posts\/41\/revisions\/866"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/wp\/v2\/media?parent=41"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/wp\/v2\/categories?post=41"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/wp\/v2\/tags?post=41"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/wp\/v2\/industry?post=41"},{"taxonomy":"product","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/wp\/v2\/product?post=41"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/heavy-equipment\/wp-json\/wp\/v2\/coauthors?post=41"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}