{"id":364,"date":"2023-02-07T17:24:00","date_gmt":"2023-02-07T22:24:00","guid":{"rendered":"https:\/\/blogs.sw.siemens.com\/valor-dfm-solutions\/?p=364"},"modified":"2026-03-27T09:44:34","modified_gmt":"2026-03-27T13:44:34","slug":"the-mysterious-case-of-the-missing-bowties-part-iii","status":"publish","type":"post","link":"https:\/\/blogs.sw.siemens.com\/electronic-systems-design\/2023\/02\/07\/the-mysterious-case-of-the-missing-bowties-part-iii\/","title":{"rendered":"The Mysterious Case of the Missing Bowties Part III"},"content":{"rendered":"\n<p><a href=\"https:\/\/blogs.sw.siemens.com\/electronic-systems-design\/2023\/01\/26\/the-mysterious-case-of-the-missing-bowties-part-ii\/\" data-type=\"URL\" data-id=\"https:\/\/blogs.sw.siemens.com\/electronic-systems-design\/2023\/01\/26\/the-mysterious-case-of-the-missing-bowties-part-ii\/\">Previously\u2026<\/a><\/p>\n\n\n\n<p>People often say \u2018better late than never\u2019, but I\u2019ve never heard my boss say that. After much difficulty in both Fab and assembly the product was finally shipped and my headache was done.<\/p>\n\n\n\n<p>The following Monday, my boss called me into his office and asked me to sit down. You can imagine the blood drain from my face as I knew it wasn\u2019t time for my annual performance review.<\/p>\n\n\n\n<p>\u201cLook,\u201d he began. \u201cI know I was hard on you over the past few weeks about the project delays. Sorry if I came across stronger than I should have, but you know this was an important project for us.\u201d<\/p>\n\n\n\n<p>\u201cNo problem,\u201d I offered. Being yelled at beats being fired, so I was okay with his attempt at an apology.<\/p>\n\n\n\n<p>\u201cWhat can we do different <em>next<\/em> time, so we don\u2019t experience the same delays and added costs?\u201d<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignright size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"570\" height=\"511\" src=\"https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/65\/2025\/04\/detective-1-1.png\" alt=\"\" class=\"wp-image-11161\"\/><\/figure><\/div>\n\n\n<p>I had been thinking about this and had come to my own conclusions.<\/p>\n\n\n\n<p>\u201cThe main problem is our EDA vendor\u2019s DFM software isn\u2019t truly a DFM system, and it doesn\u2019t check everything that our suppliers check. Things fall through the cracks.\u201d<\/p>\n\n\n\n<p>\u201cSo, what good is it?\u201d he asked, not entirely rhetorically.<\/p>\n\n\n\n<p>\u201cThe other issue is we don\u2019t have a good way of staying synchronized with all our suppliers on what their process capabilities are. Some of the issues reported by both the fabricator and the CM were issues we check, but our constraint system had different rules in place. We need to find a systematic way to collaborate with our suppliers to stay current on their manufacturing process capabilities.\u201d<\/p>\n\n\n\n<p>\u201cIt sounds like you\u2019ve put some thought into this. Do you have any suggestions how to improve the situation? Do any other software tools do a better job with these two topics?\u201d<\/p>\n\n\n\n<p>This time I didn\u2019t really mind the back-to-back questions.<\/p>\n\n\n\n<p>\u201cActually, I do,\u201d I responded. \u201cA friend of mine I used to work with uses Valor NPI for their DFM process. He said they have it integrated with their EDA tool, which is the same as ours. He even said it looks so much like our EDA DRC viewer, it only took the designers 15 minutes to learn how to use it.\u201d<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"900\" height=\"900\" src=\"https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/60\/2023\/01\/detective-6-900x900.png\" alt=\"\" class=\"wp-image-385\" srcset=\"https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/65\/2023\/01\/detective-6-900x900.png 900w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/65\/2023\/01\/detective-6-600x600.png 600w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/65\/2023\/01\/detective-6-150x150.png 150w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/65\/2023\/01\/detective-6-768x768.png 768w, https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/65\/2023\/01\/detective-6.png 1024w\" sizes=\"auto, (max-width: 900px) 100vw, 900px\" \/><\/figure>\n\n\n\n<p>\u201cThat sounds promising,\u201d he said. \u201cDoes the Valor NPI system have checks for all the issues we had with that last project? And how can we make sure we have the right DFM constraint values setup?\u201d<\/p>\n\n\n\n<p>Yes, that was two questions in a row, but at least there was hope in his voice instead of anger.<\/p>\n\n\n\n<p>\u201cI don\u2019t know but let me investigate!\u201d I said and excused myself from his office without any further discussion.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Previously\u2026 People often say \u2018better late than never\u2019, but I\u2019ve never heard my boss say that. After much difficulty in&#8230;<\/p>\n","protected":false},"author":77873,"featured_media":10153,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spanish_translation":"","french_translation":"","german_translation":"","italian_translation":"","polish_translation":"","japanese_translation":"","chinese_translation":"","footnotes":""},"categories":[13],"tags":[113,1881,1408],"industry":[341],"product":[939,940],"coauthors":[2003],"class_list":["post-364","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-pcb-design","tag-pcb-dfm","tag-valor-npi","industry-electronics-semiconductors","product-valor-dfm-solutions","product-valor-parts-library"],"featured_image_url":"https:\/\/blogs.sw.siemens.com\/wp-content\/uploads\/sites\/65\/2023\/01\/detective-9a.png","_links":{"self":[{"href":"https:\/\/blogs.sw.siemens.com\/electronic-systems-design\/wp-json\/wp\/v2\/posts\/364","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.sw.siemens.com\/electronic-systems-design\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.sw.siemens.com\/electronic-systems-design\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/electronic-systems-design\/wp-json\/wp\/v2\/users\/77873"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/electronic-systems-design\/wp-json\/wp\/v2\/comments?post=364"}],"version-history":[{"count":2,"href":"https:\/\/blogs.sw.siemens.com\/electronic-systems-design\/wp-json\/wp\/v2\/posts\/364\/revisions"}],"predecessor-version":[{"id":11162,"href":"https:\/\/blogs.sw.siemens.com\/electronic-systems-design\/wp-json\/wp\/v2\/posts\/364\/revisions\/11162"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/electronic-systems-design\/wp-json\/wp\/v2\/media\/10153"}],"wp:attachment":[{"href":"https:\/\/blogs.sw.siemens.com\/electronic-systems-design\/wp-json\/wp\/v2\/media?parent=364"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/electronic-systems-design\/wp-json\/wp\/v2\/categories?post=364"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/electronic-systems-design\/wp-json\/wp\/v2\/tags?post=364"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/electronic-systems-design\/wp-json\/wp\/v2\/industry?post=364"},{"taxonomy":"product","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/electronic-systems-design\/wp-json\/wp\/v2\/product?post=364"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/blogs.sw.siemens.com\/electronic-systems-design\/wp-json\/wp\/v2\/coauthors?post=364"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}